Once the crete is set i d build my walls roof single floor.
Sleeper floor construction.
However i ve been reading thru the 2006 irc and i can t find anything specific to this idea.
In a closet or pantry.
Apply a 1 4 inch bead of construction adhesive around the perimeter of a wood shim and turn the glue side toward the floor.
Snap chalklines to help you position the sleepers.
The internal load bearing walls are called sleeper walls and are very often built with gaps in between the bricks to allow a free flow of air under the floor.
Measure and cut the sleepers as you would for a concrete floor but position the sleepers in one of two ways.
Often closets or pantries do not have a baseboard molding.
Building a deck from wood requires special considerations due to the effect that moisture has on the material.
Either line them up directly over the joists that lie beneath the subfloor or run them perpendicular to the joists.
Install plywood over sleepers at 90 degree angle to direction of finished flooring 1 4 spacing all edges and breaking joints 4.
Set out the sleepers along the perimeter of the room and in their approximate locations across the rest of the floor cutting them to length as necessary.
Repeat the process across the entire floor to level all remaining sleeper joists.
Install maple flooring parallel with main playing court by nailing or stapling approximately 12 o c.
Sleepers help homeowners build decks with less effort and in tight spaces that don t allow for deep digging.
This stops any build up of condensation and is assisted by building in airbricks through the external walls.
Then install advantech 3 4 over the sleepers and carpet on that.
Attach with nails or staples 12 o c.
Or as specified by the flooring manufacturer.
One way that builders have designed to mitigate the spread of rot involves laying extra pieces of wood called sleepers.
Slide the shim under the sleepers until the air bubble is in the center of the level.
Avoid a sleeper layout where the boards are parallel to the joists but run between them because this configuration lacks structural support.
This method only measures the thickness of the floor covering.